Project:  Blenheim Park Estates - Corporate Office
Technology: High Efficiency Gas System

This project was a complete remodel, Rendis installed an ATAG gas boiler system with vertical column radiators.

 The project was installed with an industrial look, exposed copper pipe work and electric conduit fittings throughout. All controlled by the amazing ATAG ONE controller for remote access. The building incorporated different design ideas and finishes to show the potential clients the great variety and quality of the finishes available.

Blenheim Park photo 2.jpg

Previous 

Next  →